Warri South (local government area)
How we know this.
Every figure on this site is supposed to trace back to a document somebody published. This page is that claim being checked rather than asserted — for Warri South (local government area), here is the chain.
The documents behind it
National Population Commission — 2006 Census
records Population census 2006 Official record
records Population census 2006 Official record
OpenDelta — Population projection from the 2006 census
records Population estimate Our calculation
records Population estimate Our calculation
OpenDelta — Data gap register
records School enrolment Not yet published
records School enrolment Not yet published
OpenDelta — Recorded absence — not yet published
records Council chairman Not yet published
records Council chairman Not yet published
Earth Search (Element 84) / ESA Copernicus — Earth Search STAC — Sentinel-2 and Sentinel-1 coverage over Delta State
records Satellite optical passes From satellite
records Satellite optical passes From satellite
Retrieved dates and licence terms for each of these are on the data page.
Directly connected
holds a contract in
Rehabilitation of egbokodo-itsekiri road and asphalt overlay of swiss cottage r…
holds a contract in
Infrastructural upgrade at ikengbuwa primary school, warri south local governme…
holds a contract in
Upgrade of infrastructural facilities at college of commerce (ucc) igbudu, warr…
holds a contract in
Installation of all-in-one led solar powered street lights at naval base in war…
holds a contract in
Construction of benikrukru township roads (phase ii), warri south-west local go…
holds a contract in
Installation of ten (10) units of 5kva/48v solar powered inverter system at hig…
holds a contract in
Establishment of information, communication and technology (ict)/computer based…
holds a contract in
Construction of father healey street with adjoining streets, off ometan road wa…
holds a contract in
Rehabilitation of the first 5km trans warri ode itsekiri bridge and access road…
holds a contract in
Rehabilitation/asphalt overlay of olu palacce/ugbori/ekurede-itsekiri road and …
holds a contract in
Construction of the ope street with a spur to omene street in warri south local…
holds a contract in
Rehabilitation and asphalt overlay of etuwewe road in warri south local governm…
holds a contract in
Rehabilitation and asphalt overlay of edukugho street, off iyara road in warri …
holds a contract in
Construction of ajuyah street in warri south local government area
holds a contract in
Construction of a magnetic imagine resonance (mri) building at the central hosp…
holds a contract in
Extension of electricity power supply and installation of 6nos transformers at …
holds a contract in
Supply and installation of workshop tools and equipment for the model technical…
holds a contract in
Upgrade of infrastructural facilities at essi college ii, dore numa college and…
holds a contract in
Reconstruction of warri internal ring road from npa gate to effurun expressway,…
holds a contract in
Emergency repair works of failed section on shaguolo road/refinery flyover inte…
holds a contract in
Emergency repair works on npa expressway at uguwangue in warri south local gove…
holds a contract in
Upgrade of infrastructural facilities at uwangue college warri, warri south loc…
holds a contract in
Upgrade of infrastructural facilities at ubeji primary school, ubeji, warri sou…
holds a contract in
Remodelling of the warri city stadium, warri, warri south local government area.
holds a contract in
Renovation of 1no.6 classroom block (block 6) and construction of 1no. 4 toilet…
Why there is no "show me how these two are connected"
It was built, and then removed. Every LGA holds dozens of projects, so almost any company
reaches almost any politician in a few hops through some unrelated contract that happens
to span a second area. Those paths are real in the data and meaningless in the world, and
a reader shown one would reasonably infer a relationship that does not exist. Traversal
here follows named routes only, each one a question with a defensible answer.
Back to Warri South (local government area) This node as JSON