Warri South › Project
Reconstruction of warri internal ring road from npa gate to effurun expressway, dual carriage way, with 2 lanes per direction (phase ii), warri, warri south and uvwie local government area
The contract
- Contract sum
- ₦48,765,206,728 Official record
- Contractor
- JULIUS BERGER NIGERIA PLC
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/2077
- Awarded on
- April 2, 2026
- Due date
- April 1, 2027
- Contract period
- 12 MONTHS
- Reported progress
- 0%
- Category
- Works
- Coordinates
- 5.54938, 5.76658
What it is meant to be
The reconstruction of the Warri Internal Ring Road from NPA Gate to Effurun Expressway (Phase II) involves upgrading the existing road into a dual carriageway with two lanes in each direction. The project includes road widening, resurfacing, installation of drainage systems, and other necessary infrastructure to ensure durability and efficient traffic flow. This development is aimed at addressing issues such as traffic congestion, road deterioration, and poor accessibility within the Warri metropolis. The project is expected to significantly improve transportation within Warri South and Uvwie Local Government Areas by enhancing connectivity between key commercial and residential zones. It will reduce travel time, improve safety for road users, and support economic growth by facilitating the movement of goods and services. Additionally, the construction process will create employment opportunities and contribute to sustainable urban development in the region. -->
What has been checked
The ground at these coordinates
One of these looks is disputed and we are not calling it a comparison. The archive's own classifier reports the site clear; the picture is full of near-white pixels anyway. That is either low cloud the classifier missed or bare ground, and nothing here can tell you which — which is exactly why a picture from orbit is not a site visit. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 48765206727.54 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 0 | Official record | Delta State Public Procurement Commission · original |
| project_status | New Projects | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-04-02 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2027-04-01 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 0 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works