Reconstruction of warri internal ring road from npa gate to effurun expressway, dual carriage way, with 2 lanes per direction (phase ii), warri, warri south and uvwie local government area

UvwieWarri South · Warri, Warri South and Uvwie Local Government Area

Budget
Award
Build
Verified

The contract

Contract sum
₦48,765,206,728 Official record
Contractor
JULIUS BERGER NIGERIA PLC
Awarded by
STATE TENDERS BOARD
Reference
DSPPC/CNO/2077
Awarded on
April 2, 2026
Due date
April 1, 2027
Contract period
12 MONTHS
Reported progress
0%
Category
Works
Coordinates
5.54938, 5.76658

What it is meant to be

The reconstruction of the Warri Internal Ring Road from NPA Gate to Effurun Expressway (Phase II) involves upgrading the existing road into a dual carriageway with two lanes in each direction. The project includes road widening, resurfacing, installation of drainage systems, and other necessary infrastructure to ensure durability and efficient traffic flow. This development is aimed at addressing issues such as traffic congestion, road deterioration, and poor accessibility within the Warri metropolis. The project is expected to significantly improve transportation within Warri South and Uvwie Local Government Areas by enhancing connectivity between key commercial and residential zones. It will reduce travel time, improve safety for road users, and support economic growth by facilitating the movement of goods and services. Additionally, the construction process will create employment opportunities and contribute to sustainable urban development in the region. -->

What has been checked

Not yet checked No citizen report or inspection is recorded yet.

The ground at these coordinates

Satellite view of the site on 2026-02-15
Before the award 2026-02-15 · unclear

One of these looks is disputed and we are not calling it a comparison. The archive's own classifier reports the site clear; the picture is full of near-white pixels anyway. That is either low cloud the classifier missed or bare ground, and nothing here can tell you which — which is exactly why a picture from orbit is not a site visit. From satellite

Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.

Awarding body State Tenders Board awarded this contract. Delta State has around 30 boards, agencies and commissions that spend public money outside the ministry structure, each with a head of its own. The names of these office holders are not yet published.

Sources for this record

What we knowValueClassSource
contract_sum 48765206727.54 Official record Delta State Public Procurement Commission · original
project_progress 0 Official record Delta State Public Procurement Commission · original
project_status New Projects Official record Delta State Public Procurement Commission · original
contract_awarded_on 2026-04-02 Official record Delta State Public Procurement Commission · original
expected_completion 2027-04-01 Official record Delta State Public Procurement Commission · original
project_field_evidence not yet published Not yet published OpenDelta
satellite_clear_looks 0 From satellite Copernicus Sentinel-2 via Earth Search (Element 84) · original

What people who have been there say

Reports from people who have visited, alongside the register's progress figure.

No reports on this project yet

No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published

How we know this

Responses to this record

Published as received, in the sender's words, without editing for length.

No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.

Respond to this record How the right of reply works

Also here