Where contract money is allocated, and what the register reports.
₦1.06tn awarded across 25 local government areas. Everything below is the state's published register, totalled and compared to make it easier to read.
Larger contracts are more often still in progress
The register publishes a value and a count for each status. Dividing value by count gives the average contract size.
Average contract, by reported status
Total contract value for each reported status divided by the number of projects carrying it. Both figures are published; the division is ours. Our calculation
What that means
4.0×
An unfinished contract is on average 4.0 times larger than a finished one. 122 projects are reported complete and they carry ₦105.05bn between them; 275 are not complete and carry ₦955.10bn.
Status as reported by the publisher; not independently checked. Not yet published
When it was awarded, and on what
Awarded by year
Contract value by the year the award was published. Official record
What is being bought
Categories exactly as the register writes them. Official record
Where it went
Each LGA's share of all the contract value, set against its share of the people. An area holding more of the money than of the population sits above 1.0. Click a bar to open that LGA.
Our calculation How the two shares are calculated
| How we processed it | Contract sums summed by LGA, with multi-LGA contracts split evenly between the LGAs named, as a share of the state total; set against that LGA's share of the state population, projected from the 2006 census at 3.0% a year. |
Overstates LGAs hosting corridor infrastructure that serves several LGAs, and inherits the uncertainty of a population estimate from a 2006 census. It is a comparison of shares, not money anybody received.
All 25 local government areas, as a table
| Local government area | Projects | Value | Share of the money | Share of the people |
|---|---|---|---|---|
| Okpe | 73 | ₦285.12bn | 26.9% | 3.1% |
| Oshimili South | 61 | ₦93.25bn | 8.8% | 3.6% |
| Ika South | 14 | ₦81.10bn | 7.6% | 4.1% |
| Uvwie | 25 | ₦78.39bn | 7.4% | 4.6% |
| Ndokwa East | 11 | ₦39.57bn | 3.7% | 2.5% |
| Oshimili North | 14 | ₦40.15bn | 3.8% | 2.9% |
| Warri South | 42 | ₦85.61bn | 8.1% | 7.6% |
| Warri South West | 14 | ₦29.86bn | 2.8% | 2.8% |
| Ethiope East | 15 | ₦47.32bn | 4.5% | 4.9% |
| Burutu | 15 | ₦47.78bn | 4.5% | 5.1% |
| Aniocha North | 19 | ₦22.97bn | 2.2% | 2.5% |
| Udu | 12 | ₦27.12bn | 2.6% | 3.5% |
| Ndokwa West | 11 | ₦23.05bn | 2.2% | 3.6% |
| Ika North East | 22 | ₦21.43bn | 2.0% | 4.4% |
| Ethiope West | 15 | ₦19.27bn | 1.8% | 4.9% |
| Isoko South | 13 | ₦22.23bn | 2.1% | 5.7% |
| Sapele | 13 | ₦16.10bn | 1.5% | 4.2% |
| Patani | 5 | ₦5.85bn | 0.6% | 1.6% |
| Ughelli South | 11 | ₦18.68bn | 1.8% | 5.2% |
| Isoko North | 12 | ₦11.74bn | 1.1% | 3.5% |
| Ughelli North | 24 | ₦22.37bn | 2.1% | 7.8% |
| Warri North | 4 | ₦8.21bn | 0.8% | 3.3% |
| Aniocha South | 7 | ₦7.90bn | 0.7% | 3.5% |
| Bomadi | 2 | ₦4.59bn | 0.4% | 2.1% |
| Ukwuani | 4 | ₦479.3m | 0.0% | 2.9% |
Who holds it
Two standard readings of the same question, which disagree.
Concentration
The Herfindahl-Hirschman index here is 562, which the standard reading calls unconcentrated across 208 distinct contractor names.
Ten contractors together hold 58.9% of all the value. Both measures are correct; they describe different things.
Similar names have not been merged — entity resolution would likely raise concentration, so this figure understates rather than overstates it. Once similar names are merged, concentration may be higher. Our calculation
Largest ten by value held
JULIUS BERGER NIGERIA PLC ₦187.35bn · 17.7% LEBTECH CONSTRUCTION LIMITED ₦70.30bn · 6.6% CCECC ₦68.89bn · 6.5% SPRING CONCEPT & COMPANY ₦62.34bn · 5.9% SETRACO (NIGERIA) LIMITED ₦49.79bn · 4.7% LEVANT CONSTRUCTION LIMITED ₦47.24bn · 4.5% NIGER CONSTRUCTION LTD (NIGER… ₦37.97bn · 3.6% ROADWELL CONTRACTING LIMITED ₦37.08bn · 3.5% SINOMA INVESTMENT INTERNATION… ₦33.01bn · 3.1% PERCULIAR ULTIMATE CONCERNS L… ₦29.94bn · 2.8%All 208 contractors. Company ownership details are not yet published.
Past the completion date
"Late" covers a project three days over and one that has not started. They are shown separately because they are different.
See each one, and the ground at the sites we can see
How far past the date
'Past its completion date' is not 'abandoned'. Both the date and the progress figure come from the publisher and are not independently checked.
Every project past its date (156)
| Project | LGA | Days late | Progress | Value |
|---|---|---|---|---|
| Landscapping of the surrounding of the auditorium of the college of nursing… | Warri South | 209 | 90% | ₦40.0m |
| Construction of 1no. 4 classroom block with an office at agogboro primary s… | Warri South West | 201 | 95% | ₦119.9m |
| Upgrade of infrastructural facilities at tuomo grammar school, tuomo in bur… | Burutu | 194 | 45% | ₦100.0m |
| Upgrade of infrastructural facilities at umukwata secondary school, umukwat… | Ukwuani | 194 | 40% | ₦97.5m |
| Upgrade of infrastructural facilities at orhuwhorun high school orhuwhorun,… | Udu | 189 | 45% | ₦116.2m |
| Renovation of 1no.6 classroom block (block 6) and construction of 1no. 4 to… | Warri South | 189 | 55% | ₦119.6m |
| Infrastructural upgrade at essi college 1 warri and isiovbe primary school … | Warri South | 186 | 85% | ₦115.3m |
| Supply of 8000 sets (table and chair) of pupils plastic furniture to three … | Oshimili South | 185 | 80% | ₦471.0m |
| Upgrade of infrastructural facilities and supply of 33 pupils and 7 teacher… | Patani | 185 | 85% | ₦119.9m |
| Upgrade of infrastructural facilities at oloduwa grammar school opuama, war… | Warri North | 185 | 85% | ₦164.6m |
| Renovation of 1no. 6 classroom block with an office at evwrutu primary scho… | Ughelli North | 182 | 80% | ₦120.0m |
| Infrastructural development at agbon primary school isiokolo, ethiope east … | Ethiope East | 182 | 80% | ₦119.9m |
| Demolition/construction of three unit of 1 bedroom staff quarters at otseye… | Warri South West | 174 | 75% | ₦149.6m |
| Upgrade of infrastructural facilities at egobiri primary school, egodor/agb… | Burutu | 173 | 90% | ₦119.5m |
| Construction of four bed male student hostel (lot 2b) at southern delta uni… | Okpe | 172 | 0% | ₦688.5m |
| Rehabilitation/asphalt overlay of dennis osadebey way (from inter-bau round… | Oshimili South | 172 | 70% | ₦6.33bn |
| Infrastructural development works at college of commerce secondary school w… | Warri South | 172 | 0% | ₦149.7m |
| Infrastructural development works at amiemiedi secondary school, okwetolor,… | Okpe | 172 | 65% | ₦119.9m |
| Infrastructural development at government college ughelli north local gover… | Ughelli North | 172 | 70% | ₦115.8m |
| Infrastructural upgrade at ishe primary school ewulu, aniocha south local g… | Aniocha South | 172 | 75% | ₦100.0m |
| Procurement of w.19 medium fibre boats, yamaha european standard 15hp outbo… | Oshimili South | 171 | 0% | ₦84.0m |
| Construction of a skill acquisition centre at southern delta university, or… | Isoko North | 171 | 70% | ₦696.7m |
| Infrastructural development at ibakpa primary school, ofagbe in isoko-north… | Isoko North | 168 | 65% | ₦149.9m |
| Upgrade of infrastructural facilities at sanubi secondary school, sanubi, u… | Ughelli North | 167 | 70% | ₦100.0m |
| Renovation of the pointer newspaper office asaba, oshimili south local gove… | Oshimili South | 165 | 65% | ₦43.1m |
| Infrastructural development at ekuma primary school, ekuma abavo, ika south… | Ika South | 164 | 60% | ₦150.0m |
| Procurement and supply of fishing boats | Oshimili South | 160 | 60% | ₦337.0m |
| Infrastructural development at amai secondary commercial and igete primary … | Ukwuani | 159 | 0% | ₦119.9m |
| Infrastructural development at martins primary school, issele uku, aniocha … | Aniocha North | 158 | 75% | ₦99.9m |
| Installation of all -in-one led solar powered street lights at ibadan quart… | Isoko North | 154 | 65% | ₦117.8m |
| Construction of school of midwifery and nursing sciences at the osubi speci… | Okpe | 153 | 80% | ₦3.72bn |
| Supply and distribution of pupils furniture to public primary schools in de… | Ethiope East | 152 | 0% | ₦267.6m |
| Infrastructural development at idumu-ogo mixed secondary school, idumu-ogo … | Aniocha North | 152 | 65% | ₦129.8m |
| Infrastructural development at orerokpe secondary school orerokpe, okpe loc… | Okpe | 152 | 55% | ₦100.0m |
| Upgrade of infrastructural facilities at uwangue college warri, warri south… | Warri South | 151 | 15% | ₦119.2m |
| Infrastructural upgrade at nkwor primary school, idumuje-unor aniocha north… | Aniocha North | 151 | 65% | ₦120.0m |
| Completion of the construction of etua ukpo/etua etiti/etua oliogo road wit… | Ndokwa West | 151 | 75% | ₦4.86bn |
| Development of external work at some facilities at southern delta universit… | Okpe | 151 | 45% | ₦698.0m |
| Infrastructural intervention at army day secondary school, effurun in uvwie… | Uvwie | 150 | 60% | ₦99.1m |
| Infrastructural development works at deinbunugha primary school, oboro and … | Burutu | 150 | 20% | ₦149.8m |
| Upgrade of infrastructural facilities at ubeji primary school, ubeji, warri… | Warri South | 150 | 60% | ₦99.9m |
| Infrastructural development at oviri-okpe secondary school, oviri, okpe loc… | Okpe | 150 | 55% | ₦99.1m |
| Infrastructural upgrades at anwufa primary school, ekwuoma and adagba prima… | Ika North East | 150 | 65% | ₦119.3m |
| Infrastructural development at aven secondary school, patani, patani local … | Patani | 149 | 0% | ₦99.6m |
| Emergency repair works of failed section on shaguolo road/refinery flyover … | Warri South | 147 | 5% | ₦456.6m |
| Emergency repair works on npa expressway at uguwangue in warri south local … | Warri South | 147 | 10% | ₦305.3m |
| Additional construction of 1no. laboratory block with offices and supply of… | Patani | 146 | 10% | ₦49.7m |
| Upgrade of infrastructural facilities at owodokpokpo grammar school, igbide… | Isoko South | 146 | 0% | ₦120.0m |
| Infrastructural intervention at owevwe secondary school, owevwe-agbarha, ug… | Ughelli North | 146 | 0% | ₦98.8m |
| Infrastructural development at egbo grammar school, egbo-uhure, ughelli sou… | Ughelli South | 146 | 0% | ₦75.8m |
| Infrastructural development at oviri olomu primary school oviri-olomu, oter… | Ughelli South | 146 | 65% | ₦119.4m |
| Infrastructural upgrade at ika south local government area (constituency pr… | Ika South | 145 | 0% | ₦164.9m |
| Infrastructural intervention at ogene primary school ashaka, ndokwa east lo… | Ndokwa East | 145 | 0% | ₦96.5m |
| Infrastructural development works at mixed secondary school ugiliamai in nd… | Ndokwa West | 145 | 0% | ₦100.0m |
| Infrastructural development works at zappa mixed secondary school asaba, os… | Oshimili South | 145 | 60% | ₦99.8m |
| Upgrade of infrastructural facilities at oviri-olomu secondary school, ovir… | Ughelli South | 145 | 0% | ₦149.9m |
| Infrastructural development and supply of student furniture at olona mixed … | Aniocha North | 145 | 0% | ₦150.0m |
| Infrastructural development at eghereka primary school, ewu-urhobo and ovwo… | Ughelli South | 145 | 0% | ₦149.8m |
| Infrastructural development at fade ede, serikoromor primary schools and se… | Burutu | 144 | 65% | ₦165.0m |
| Infrastructural upgrades of idare primary school gbokoda, warri north local… | Warri North | 143 | 10% | ₦119.4m |
| Rehabilitation/construction of okuvo/okuokolo/mereje road with 1.625m spur … | Okpe | 143 | 80% | ₦5.65bn |
| Rehabilitation of ugwrughelli/ehidi road and construction of chief lyn ivie… | Ughelli North | 143 | 80% | ₦3.50bn |
| Infrastructural facilities at akari-obodo and obetim-uno secondary schools … | Ndokwa East | 143 | 60% | ₦164.6m |
| Upgrade of infrastructural facilities at orodje grammar school, sapele, sap… | Sapele | 140 | 0% | ₦119.8m |
| Construction of 4no. 300kva 11/0.400kv distribution transformer substations… | Okpe | 140 | 0% | ₦749.6m |
| Construction of 4no. 33kv overhead line and installation 1no. 15mva, 33/11k… | Okpe | 140 | 35% | ₦646.6m |
| Infrastructural development at afiesere primary school and agadama secondar… | Ughelli North | 140 | 55% | ₦150.0m |
| Infrastructural development at ogwezi primary school aboh, ndokwa-east loca… | Ndokwa East | 135 | 20% | ₦99.6m |
| Infrastructural development at oreki secondary school, oghareki, ethiope we… | Ethiope West | 133 | 0% | ₦99.9m |
| Reconstruction of eku-osubi road from p.t.i junction to osubi in uvwie and … | Uvwie | 132 | 65% | ₦47.15bn |
| Established thirty (30) tomato and cucumber accelerated agriculture develop… | Okpe | 132 | 70% | ₦125.0m |
| Additional work on the reconstruction and rehabilitation of the failed uzer… | Isoko South | 131 | 55% | ₦3.17bn |
| Upgrade of infrastructural facilities at ufuoma mixed secondary school sape… | Sapele | 130 | 0% | ₦99.7m |
| Upgrade of infrastructural facilities at essi college ii, dore numa college… | Warri South | 126 | 0% | ₦149.8m |
| Upgrade of infrastructural facilities at oghareki grammar school, oghareki … | Ethiope West | 126 | 0% | ₦119.9m |
| Infrastructural development at ijehon primary school, umunede, ika north-ea… | Ika North East | 126 | 0% | ₦99.8m |
| Flood and erosion control measures at dennis osadebey way from traffic ligh… | Oshimili South | 126 | 45% | ₦1.55bn |
| Construction of princess pat. ajudua crescent with a spur to new general ho… | Oshimili South | 125 | 70% | ₦329.6m |
| Infrastructural upgrade at tareabe primary school burutu, burutu local gove… | Burutu | 118 | 40% | ₦149.5m |
| Construction of aboh-akarai road with a bridge across the okiri river, ndok… | Ndokwa East | 118 | 35% | ₦29.84bn |
| Rehabilitation and asphalt overlay of ekpan/oviore/ovu/okpara inland/isioko… | Ethiope East | 118 | 65% | ₦12.01bn |
| Rehabilitation/construction of chief wellington oyibo/community road mosaga… | Ethiope West | 113 | 70% | ₦1.66bn |
| Construction of delta state house of assembly cooperative estate roads, okp… | Oshimili North | 112 | 75% | ₦1.90bn |
| Construction of egwulemu street extension and sunny ogwu street, agbor-obi … | Ika South | 112 | 60% | ₦238.7m |
| Infrastructural upgrades at onyeagwu primary school umunede, ika south lga. | Ika North East | 110 | 40% | ₦60.5m |
| Rehabilitation and asphalt overlay of old welfare road, off lower erejuwa r… | Warri South | 110 | 45% | ₦320.6m |
| Rehabilitation/asphalt overlay of olu palacce/ugbori/ekurede-itsekiri road … | Warri South | 106 | 45% | ₦1.99bn |
| Rehabilitation of arho road by heroes of faith church ughelli, ughelli nort… | Ughelli North | 106 | 40% | ₦1.11bn |
| Construction of ogbe-ijoh/aladja road (phase11), warri south- west and udu … | Warri South West | 106 | 55% | ₦3.00bn |
| Upgrade of infrastructural facilities at aboh grammar school aboh, ndokwa e… | Ndokwa East | 105 | 0% | ₦149.8m |
| Reconstruction of a dual carriage way on the warri/sapele/benin road from t… | Uvwie | 97 | 65% | ₦35.75bn |
| Construction of flood control measures from orikeze avenue junction through… | Ika South | 97 | 65% | ₦871.5m |
| Construction of new solar hybrid water supply scheme at idumuje-ugboko in a… | Aniocha North | 91 | 0% | ₦90.0m |
| Construction of concrete landing jetty with waiting shed at ayakoromo in bu… | Burutu | 90 | 55% | ₦300.0m |
| Completion of crash road and gate on both sides of the runway at asaba airp… | Oshimili South | 88 | 55% | ₦629.9m |
| Infrastructural development at oshimili south local government area, asaba | Oshimili South | 88 | 0% | ₦149.8m |
| Construction of okpanam-ugbolu road, oshimili north local government area | Oshimili North | 88 | 30% | ₦21.31bn |
| Infrastructural intervention at ometan primary school, ughoton in okpe loca… | Okpe | 83 | 0% | ₦72.7m |
| Infrastructural development at okpanam high school, oshimili north local go… | Oshimili North | 83 | 0% | ₦99.2m |
| Construction of the ope street with a spur to omene street in warri south l… | Warri South | 81 | 0% | ₦318.8m |
| Furnishing of model technical college oghareki, ethiope west local governme… | Ethiope West | 81 | 0% | ₦273.0m |
| Purchase and installation of transformers at model technical college, oghar… | Ethiope West | 81 | 0% | ₦425.7m |
| Construction of internal roads at ugbolu hill top government layout (phase … | Oshimili North | 78 | 85% | ₦4.37bn |
| Construction of health centre road, odoruru town in patani local government… | Patani | 78 | 75% | ₦450.9m |
| Construction of egodo-ogbeinbene road, burutu local government area | Burutu | 78 | 85% | ₦2.15bn |
| Construction of benikrukru township roads (phase ii), warri south-west loca… | Warri South | 78 | 75% | ₦3.28bn |
| Construction of okwighele amuokpokpor road, okpe local government area. | Okpe | 78 | 45% | ₦3.96bn |
| Rehabilitation and asphalt overlay of the old okpanam road from post office… | Oshimili North | 78 | 55% | ₦1.25bn |
| Construction of umuoshimi road with spurs to ogbe-aku, market road and san'… | Aniocha North | 78 | 55% | ₦2.39bn |
| Construction of internal roads/drainage at the nysc orientation camp, issel… | Aniocha North | 78 | 65% | ₦1.52bn |
| Upgrade of infrastructural facilities at ovrode grammar school ovrode, isok… | Isoko North | 77 | 0% | ₦120.0m |
| Construction of okowa crescent, off ughelli/patani expressway, ughelli in u… | Ughelli North | 76 | 40% | ₦797.1m |
| Completion of the construction of bulu-angiama road, off ughelli/patani exp… | Patani | 76 | 55% | ₦5.13bn |
| Completion of the construction of unoghovo road from benin expressway to ov… | Ethiope West | 76 | 55% | ₦2.14bn |
| Infrastructural development at oginigbo secondary school, ughelli south loc… | Ughelli South | 74 | 0% | ₦119.5m |
| Infrastructural upgrades at urhobo college, effurun, uvwie local government… | Uvwie | 74 | 0% | ₦119.5m |
| Infrastructural intervention at ilabor primary school, igbodo, ika north-ea… | Ika North East | 74 | 0% | ₦400.0m |
| Construction of perimeter block wall fence with gate house at oha secondary… | Okpe | 74 | 0% | ₦147.4m |
| Installation of all-in-one led solar powered streetlights along cemetary ro… | Ika North East | 71 | 50% | ₦61.1m |
| Construction of iwride-iyede international roads (phase i), isoko north loc… | Isoko North | 70 | 35% | ₦1.88bn |
| Construction of chris abudei/ogbueshi m. onochie streets asaba, oshimili so… | Oshimili South | 70 | 55% | ₦3.47bn |
| Construction and furnishing of administrative building and rank and file qu… | Okpe | 69 | 10% | ₦670.1m |
| Construction of ejirue/ovhokwo street, ekpan in uvwie local government area | Uvwie | 69 | 5% | ₦250.0m |
| Construction of kolokolo/tisun road warri north local government area | Warri North | 68 | 55% | ₦3.89bn |
| Procurement of training items and competition equipment for delta state par… | Oshimili South | 67 | 0% | ₦81.9m |
| Procurement and installation of workshop equipment at the model technical c… | Ethiope West | 66 | 0% | ₦1.66bn |
| Construction of kantu internal roads, warri south-west local government area | Warri South West | 65 | 65% | ₦1.58bn |
| Renovation of dilapidated building at the primary health care centre torugb… | Burutu | 62 | 40% | ₦92.6m |
| Construction of owa-ewere road, owa-oyibu, ika north-east local government … | Ika North East | 62 | 30% | ₦1.65bn |
| Construction of ogbe-isogban community road abavo, ika south local governme… | Ika South | 62 | 40% | ₦2.26bn |
| Infrastructural development at esezi secondary school, ughoton, okpe local … | Okpe | 59 | 55% | ₦171.5m |
| Construction of beatrice nwayidindu street with a spur to alero estate road… | Oshimili South | 58 | 40% | ₦358.0m |
| Installation of solar powered security lighting system within the premises … | Okpe | 55 | 30% | ₦67.3m |
| Completion of the construction of ituru road elume, sapele local government… | Sapele | 55 | 55% | ₦5.06bn |
| Construction of okwejeba/jakpa mereje road okpe local government area | Okpe | 55 | 55% | ₦4.44bn |
| Construction of ogbelle (oil road) the old okpe road/dafiode street and "a"… | Okpe | 53 | 90% | ₦3.96bn |
| Construction and furnishing of administrative building and rank and file qu… | Ethiope East | 52 | 10% | ₦670.1m |
| Construction of petroleum training institute (p.t.i.) fence (p.t.i. junctio… | Okpe | 49 | 0% | ₦118.7m |
| Construction of osubi specialist hospital (osh), (main building) osubi, okp… | Okpe | 49 | 75% | ₦29.06bn |
| Installation of ten (10) units of 5kva/48v solar powered inverter system at… | Warri South | 47 | 35% | ₦135.3m |
| Reconstruction of orerokpe/okuloho/oviri road in okpe local government area | Okpe | 32 | 75% | ₦14.70bn |
| Construction of faculty building "b" at the delta state university of scien… | Okpe | 31 | 55% | ₦3.18bn |
| Upgrade of e-procurement system, e-gps version 2.0 for delta state public p… | Oshimili South | 27 | 0% | ₦165.0m |
| Infrastructural intervention at orogodo primary school, agbor in ika south … | Ika South | 24 | 0% | ₦99.7m |
| Infrastructural intervention at olisemeka primary school, issele-azagba, an… | Aniocha North | 24 | 0% | ₦55.9m |
| Construction/asphalt overlay of momoh/okere/friday ani streets off ovie pal… | Uvwie | 21 | 0% | ₦574.1m |
| Rehabilitation of bomadi/gbaregolor road, bomadi local government area | Bomadi | 21 | 40% | ₦4.49bn |
| Rehabilitation/reconstruction of failed portion of some major roads in asab… | Oshimili South | 19 | 0% | ₦683.1m |
| Construction of orient drive off npa expressway and orient way off nigercat… | Uvwie | 19 | 20% | ₦521.9m |
| Reconstruction and construction of opete road from dsc expressway by planta… | Udu | 18 | 85% | ₦6.78bn |
| Construction of 33kv overhead (oh) high voltage (hv) line from emevor throu… | Isoko North | 17 | 0% | ₦310.0m |
| Rehabilitation/construction of vandalized 33kv line from abbi through emu-o… | Ndokwa West | 17 | 0% | ₦720.0m |
| Upgrade of thr existing 500kva (ipp) substation transformer to 1000kva subs… | Oshimili South | 17 | 0% | ₦97.2m |
| Upgrade of infrastructural facilities at i. i. erigbum secondary/commercial… | Ika North East | 14 | 0% | ₦109.8m |
| Emergency flood control in asaba, oshimili south local government area delt… | Oshimili South | 13 | 55% | ₦150.0m |
| Rehabilitation of chief justice marshal mukoro street/constitution of sir o… | Ughelli North | 9 | 65% | ₦595.5m |
Money this page does not cover
Most of the budget
46.1% of the 2026 capital budget appears in this register. Everything above describes the visible part. Our calculation
The 25 LGAs
The 25 LGAs run their own budgets and payrolls. Council revenue and payroll are covered on the council pages: CouncilWatch.