Past its date.
The register publishes a completion date for each contract. 156 projects worth ₦324.33bn are past theirs.
48 where the ground can be seen
A clear look before the money was committed and a clear look since. What changed between them is for you to judge; this platform draws no conclusion from it.
Reconstruction of eku-osubi road from p.t.i junction to osubi in uvwie and okpe local g…
Contractor: Julius berger nigeria plc. Reported progress: 65% (not independently checked).
Construction of osubi specialist hospital (osh), (main building) osubi, okpe local gove…
Contractor: Sinoma investment international ltd. Reported progress: 75% (not independently checked).
Reconstruction of orerokpe/okuloho/oviri road in okpe local government area
Contractor: Roadman construction enterprise. Reported progress: 75% (not independently checked).
Rehabilitation and asphalt overlay of ekpan/oviore/ovu/okpara inland/isiokolo/kokori ro…
Contractor: Levant construction limited. Reported progress: 65% (not independently checked).
Completion of the construction of bulu-angiama road, off ughelli/patani expressway junc…
Contractor: Temimaro nig. limited. Reported progress: 55% (not independently checked).
Completion of the construction of etua ukpo/etua etiti/etua oliogo road with spur to et…
Contractor: Chioino global ventures. Reported progress: 75% (not independently checked).
Construction of okwighele amuokpokpor road, okpe local government area.
Contractor: Y & w international limited. Reported progress: 45% (not independently checked).
Construction of school of midwifery and nursing sciences at the osubi specialist hospit…
Contractor: North china construction nigeria limited. Reported progress: 80% (not independently checked).
Construction of benikrukru township roads (phase ii), warri south-west local government…
Contractor: Victonjo international nigeria limited. Reported progress: 75% (not independently checked).
Construction of ogbe-isogban community road abavo, ika south local government area.
Contractor: Ify bros iron & steel construction works. Reported progress: 40% (not independently checked).
Completion of the construction of unoghovo road from benin expressway to ovade oghara, …
Contractor: Mediac resource limited. Reported progress: 55% (not independently checked).
Rehabilitation/asphalt overlay of olu palacce/ugbori/ekurede-itsekiri road and the cons…
Contractor: Levant construction limited. Reported progress: 45% (not independently checked).
Construction of iwride-iyede international roads (phase i), isoko north local governmen…
Contractor: Bryhilvan integrated. Reported progress: 35% (not independently checked).
Construction of owa-ewere road, owa-oyibu, ika north-east local government area
Contractor: Toppet nig. enterprises. Reported progress: 30% (not independently checked).
Construction of kantu internal roads, warri south-west local government area
Contractor: Ponkebi nigeria limited. Reported progress: 65% (not independently checked).
Flood and erosion control measures at dennis osadebey way from traffic light to abraka …
Contractor: Roadwell contracting limited. Reported progress: 45% (not independently checked).
Construction of internal roads/drainage at the nysc orientation camp, issele uku in ani…
Contractor: Lebtech construction limited. Reported progress: 65% (not independently checked).
Development of external work at some facilities at southern delta university, orerokpe …
Contractor: Brints engineering services limited. Reported progress: 45% (not independently checked).
Construction of a skill acquisition centre at southern delta university, orerokpe campu…
Contractor: Jeffa city modern build. Reported progress: 70% (not independently checked).
Construction of health centre road, odoruru town in patani local government area
Contractor: C-tmi enterprise. Reported progress: 75% (not independently checked).
Emergency repair works on npa expressway at uguwangue in warri south local government a…
Contractor: Roadman construction enterprise. Reported progress: 10% (not independently checked).
Construction of ejirue/ovhokwo street, ekpan in uvwie local government area
Contractor: Cromwell technologies limited. Reported progress: 5% (not independently checked).
Infrastructural facilities at akari-obodo and obetim-uno secondary schools in ndokwa-ea…
Contractor: Okeh-anagba gracious world ltd. Reported progress: 60% (not independently checked).
Infrastructural development and supply of student furniture at olona mixed secondary sc…
Contractor: Dumkelekika and sons enterprise. Reported progress: 0% (not independently checked).
Infrastructural development at ekuma primary school, ekuma abavo, ika south local gover…
Contractor: Ako designs and services. Reported progress: 60% (not independently checked).
Infrastructural development at ibakpa primary school, ofagbe in isoko-north local gover…
Contractor: Nekama global ventures. Reported progress: 65% (not independently checked).
Infrastructural development at oshimili south local government area, asaba
Contractor: Lead brigitta global limited. Reported progress: 0% (not independently checked).
Infrastructural development at idumu-ogo mixed secondary school, idumu-ogo aniocha nort…
Contractor: Thixo affairs enterprises. Reported progress: 65% (not independently checked).
Established thirty (30) tomato and cucumber accelerated agriculture development scheme …
Contractor: Medianville agro ventures. Reported progress: 70% (not independently checked).
Renovation of 1no. 6 classroom block with an office at evwrutu primary school, uvwramug…
Contractor: Otupro engineering services ltdd. Reported progress: 80% (not independently checked).
Infrastructural upgrade at nkwor primary school, idumuje-unor aniocha north local gover…
Contractor: Palisade contracting. Reported progress: 65% (not independently checked).
Upgrade of infrastructural facilities and supply of 33 pupils and 7 teachers furniture …
Contractor: Oyindeinyefa ventures. Reported progress: 85% (not independently checked).
Infrastructural development works at amiemiedi secondary school, okwetolor, okpe local …
Contractor: Ako designs and services. Reported progress: 65% (not independently checked).
Infrastructural development at agbon primary school isiokolo, ethiope east local govern…
Contractor: Bmg rolins enterprises. Reported progress: 80% (not independently checked).
Infrastructural development at amai secondary commercial and igete primary schools, ama…
Contractor: Mamatee water solutions enterprises. Reported progress: 0% (not independently checked).
Construction of 1no. 4 classroom block with an office at agogboro primary school, agogb…
Contractor: Nuwe ventures. Reported progress: 95% (not independently checked).
Infrastructural upgrades at anwufa primary school, ekwuoma and adagba primary school, o…
Contractor: Hopa integrated services. Reported progress: 65% (not independently checked).
Installation of all -in-one led solar powered street lights at ibadan quarter okini qua…
Contractor: Currentec innovation. Reported progress: 65% (not independently checked).
Upgrade of infrastructural facilities at tuomo grammar school, tuomo in burutu local go…
Contractor: Besa mercantile company. Reported progress: 45% (not independently checked).
Upgrade of infrastructural facilities at sanubi secondary school, sanubi, ughelli north…
Contractor: Geomakpor nig. enterprises. Reported progress: 70% (not independently checked).
Infrastructural development at orerokpe secondary school orerokpe, okpe local governmen…
Contractor: Ajimo and sons enterprises. Reported progress: 55% (not independently checked).
Infrastructural development works at zappa mixed secondary school asaba, oshimili south…
Contractor: Henryzak & sons company. Reported progress: 60% (not independently checked).
Upgrade of infrastructural facilities at umukwata secondary school, umukwata, ukwuani l…
Contractor: Besa mercantile company. Reported progress: 40% (not independently checked).
Infrastructural intervention at ogene primary school ashaka, ndokwa east local governme…
Contractor: Evams infrastructural development company limited. Reported progress: 0% (not independently checked).
Procurement of w.19 medium fibre boats, yamaha european standard 15hp outboard engines,…
Contractor: Ezinne ventures. Reported progress: 0% (not independently checked).
Installation of all-in-one led solar powered streetlights along cemetary road, boji-boj…
Contractor: Nextech electrical services. Reported progress: 50% (not independently checked).
Infrastructural upgrades at onyeagwu primary school umunede, ika south lga.
Contractor: Mabogra limited. Reported progress: 40% (not independently checked).
Additional construction of 1no. laboratory block with offices and supply of science equ…
Contractor: Shalanga worldwide services. Reported progress: 10% (not independently checked).
84 the satellite could not see
Cloud covered these sites on one or both dates, so no comparison is possible. That is a fact about the Niger Delta's weather rather than a gap in this pipeline.
| Project | Days late | Value | Area |
|---|---|---|---|
| Reconstruction of a dual carriage way on the warri/sapele/benin road fr… | 97 | ₦35.75bn | Uvwie |
| Construction of aboh-akarai road with a bridge across the okiri river, … | 118 | ₦29.84bn | Ndokwa East |
| Construction of okpanam-ugbolu road, oshimili north local government ar… | 88 | ₦21.31bn | Oshimili North |
| Rehabilitation/asphalt overlay of dennis osadebey way (from inter-bau r… | 172 | ₦6.33bn | Oshimili South |
| Rehabilitation/construction of okuvo/okuokolo/mereje road with 1.625m s… | 143 | ₦5.65bn | Okpe |
| Construction of internal roads at ugbolu hill top government layout (ph… | 78 | ₦4.37bn | Oshimili North |
| Construction of kolokolo/tisun road warri north local government area | 68 | ₦3.89bn | Warri North |
| Rehabilitation of ugwrughelli/ehidi road and construction of chief lyn … | 143 | ₦3.50bn | Ughelli North |
| Construction of chris abudei/ogbueshi m. onochie streets asaba, oshimil… | 70 | ₦3.47bn | Oshimili South |
| Additional work on the reconstruction and rehabilitation of the failed … | 131 | ₦3.17bn | Isoko South |
| Construction of ogbe-ijoh/aladja road (phase11), warri south- west and … | 106 | ₦3.00bn | Warri South West |
| Construction of umuoshimi road with spurs to ogbe-aku, market road and … | 78 | ₦2.39bn | Aniocha North |
| Construction of egodo-ogbeinbene road, burutu local government area | 78 | ₦2.15bn | Burutu |
| Construction of delta state house of assembly cooperative estate roads,… | 112 | ₦1.90bn | Oshimili North |
| Rehabilitation/construction of chief wellington oyibo/community road mo… | 113 | ₦1.66bn | Ethiope West |
| Procurement and installation of workshop equipment at the model technic… | 66 | ₦1.66bn | Ethiope West |
| Rehabilitation and asphalt overlay of the old okpanam road from post of… | 78 | ₦1.25bn | Oshimili North |
| Rehabilitation of arho road by heroes of faith church ughelli, ughelli … | 106 | ₦1.11bn | Ughelli North |
| Construction of flood control measures from orikeze avenue junction thr… | 97 | ₦871.5m | Ika South |
| Construction of okowa crescent, off ughelli/patani expressway, ughelli … | 76 | ₦797.1m | Ughelli North |
| Construction of 4no. 300kva 11/0.400kv distribution transformer substat… | 140 | ₦749.6m | Okpe |
| Construction of four bed male student hostel (lot 2b) at southern delta… | 172 | ₦688.5m | Okpe |
| Construction and furnishing of administrative building and rank and fil… | 69 | ₦670.1m | Okpe |
| Construction of 4no. 33kv overhead line and installation 1no. 15mva, 33… | 140 | ₦646.6m | Okpe |
| Completion of crash road and gate on both sides of the runway at asaba … | 88 | ₦629.9m | Oshimili South |
| Supply of 8000 sets (table and chair) of pupils plastic furniture to th… | 185 | ₦471.0m | Oshimili South |
| Emergency repair works of failed section on shaguolo road/refinery flyo… | 147 | ₦456.6m | Warri South |
| Purchase and installation of transformers at model technical college, o… | 81 | ₦425.7m | Ethiope West |
| Infrastructural intervention at ilabor primary school, igbodo, ika nort… | 74 | ₦400.0m | Ika North East |
| Construction of beatrice nwayidindu street with a spur to alero estate … | 58 | ₦358.0m | Oshimili South |
| Procurement and supply of fishing boats | 160 | ₦337.0m | Oshimili South |
| Construction of princess pat. ajudua crescent with a spur to new genera… | 125 | ₦329.6m | Oshimili South |
| Rehabilitation and asphalt overlay of old welfare road, off lower ereju… | 110 | ₦320.6m | Warri South |
| Construction of the ope street with a spur to omene street in warri sou… | 81 | ₦318.8m | Warri South |
| Construction of concrete landing jetty with waiting shed at ayakoromo i… | 90 | ₦300.0m | Burutu |
| Furnishing of model technical college oghareki, ethiope west local gove… | 81 | ₦273.0m | Ethiope West |
| Supply and distribution of pupils furniture to public primary schools i… | 152 | ₦267.6m | Ethiope East |
| Construction of egwulemu street extension and sunny ogwu street, agbor-… | 112 | ₦238.7m | Ika South |
| Infrastructural development at esezi secondary school, ughoton, okpe lo… | 59 | ₦171.5m | Okpe |
| Infrastructural development at fade ede, serikoromor primary schools an… | 144 | ₦165.0m | Burutu |
| Infrastructural upgrade at ika south local government area (constituenc… | 145 | ₦164.9m | Ika South |
| Upgrade of infrastructural facilities at oloduwa grammar school opuama,… | 185 | ₦164.6m | Warri North |
| Infrastructural development at afiesere primary school and agadama seco… | 140 | ₦150.0m | Ughelli North |
| Upgrade of infrastructural facilities at oviri-olomu secondary school, … | 145 | ₦149.9m | Ughelli South |
| Infrastructural development works at deinbunugha primary school, oboro … | 150 | ₦149.8m | Burutu |
| Upgrade of infrastructural facilities at aboh grammar school aboh, ndok… | 105 | ₦149.8m | Ndokwa East |
| Infrastructural development at eghereka primary school, ewu-urhobo and … | 145 | ₦149.8m | Ughelli South |
| Upgrade of infrastructural facilities at essi college ii, dore numa col… | 126 | ₦149.8m | Warri South |
| Infrastructural development works at college of commerce secondary scho… | 172 | ₦149.7m | Warri South |
| Demolition/construction of three unit of 1 bedroom staff quarters at ot… | 174 | ₦149.6m | Warri South West |
| Infrastructural upgrade at tareabe primary school burutu, burutu local … | 118 | ₦149.5m | Burutu |
| Construction of perimeter block wall fence with gate house at oha secon… | 74 | ₦147.4m | Okpe |
| Upgrade of infrastructural facilities at ovrode grammar school ovrode, … | 77 | ₦120.0m | Isoko North |
| Upgrade of infrastructural facilities at owodokpokpo grammar school, ig… | 146 | ₦120.0m | Isoko South |
| Upgrade of infrastructural facilities at oghareki grammar school, oghar… | 126 | ₦119.9m | Ethiope West |
| Upgrade of infrastructural facilities at orodje grammar school, sapele,… | 140 | ₦119.8m | Sapele |
| Renovation of 1no.6 classroom block (block 6) and construction of 1no. … | 189 | ₦119.6m | Warri South |
| Upgrade of infrastructural facilities at egobiri primary school, egodor… | 173 | ₦119.5m | Burutu |
| Infrastructural development at oginigbo secondary school, ughelli south… | 74 | ₦119.5m | Ughelli South |
| Infrastructural upgrades at urhobo college, effurun, uvwie local govern… | 74 | ₦119.5m | Uvwie |
| Infrastructural development at oviri olomu primary school oviri-olomu, … | 146 | ₦119.4m | Ughelli South |
| Infrastructural upgrades of idare primary school gbokoda, warri north l… | 143 | ₦119.4m | Warri North |
| Upgrade of infrastructural facilities at uwangue college warri, warri s… | 151 | ₦119.2m | Warri South |
| Upgrade of infrastructural facilities at orhuwhorun high school orhuwho… | 189 | ₦116.2m | Udu |
| Infrastructural development at government college ughelli north local g… | 172 | ₦115.8m | Ughelli North |
| Infrastructural upgrade at essi college 1 warri and isiovbe primary sch… | 186 | ₦115.3m | Warri South |
| Infrastructural upgrade at ishe primary school ewulu, aniocha south loc… | 172 | ₦100.0m | Aniocha South |
| Infrastructural development works at mixed secondary school ugiliamai i… | 145 | ₦100.0m | Ndokwa West |
| Infrastructural development at oreki secondary school, oghareki, ethiop… | 133 | ₦99.9m | Ethiope West |
| Infrastructural development at martins primary school, issele uku, anio… | 158 | ₦99.9m | Aniocha North |
| Upgrade of infrastructural facilities at ubeji primary school, ubeji, w… | 150 | ₦99.9m | Warri South |
| Infrastructural development at ijehon primary school, umunede, ika nort… | 126 | ₦99.8m | Ika North East |
| Upgrade of infrastructural facilities at ufuoma mixed secondary school … | 130 | ₦99.7m | Sapele |
| Infrastructural development at aven secondary school, patani, patani lo… | 149 | ₦99.6m | Patani |
| Infrastructural development at ogwezi primary school aboh, ndokwa-east … | 135 | ₦99.6m | Ndokwa East |
| Infrastructural development at okpanam high school, oshimili north loca… | 83 | ₦99.2m | Oshimili North |
| Infrastructural intervention at army day secondary school, effurun in u… | 150 | ₦99.1m | Uvwie |
| Infrastructural development at oviri-okpe secondary school, oviri, okpe… | 150 | ₦99.1m | Okpe |
| Infrastructural intervention at owevwe secondary school, owevwe-agbarha… | 146 | ₦98.8m | Ughelli North |
| Renovation of dilapidated building at the primary health care centre to… | 62 | ₦92.6m | Burutu |
| Construction of new solar hybrid water supply scheme at idumuje-ugboko … | 91 | ₦90.0m | Aniocha North |
| Procurement of training items and competition equipment for delta state… | 67 | ₦81.9m | Oshimili South |
| Infrastructural development at egbo grammar school, egbo-uhure, ughelli… | 146 | ₦75.8m | Ughelli South |
| Infrastructural intervention at ometan primary school, ughoton in okpe … | 83 | ₦72.7m | Okpe |
24 not yet checked by satellite
Past their date, and no satellite window has been fetched for them yet. This is our backlog, and it is counted separately for that reason.
| Project | Days late | Value | Area |
|---|---|---|---|
| Landscapping of the surrounding of the auditorium of the college of nur… | 209 | ₦40.0m | Warri South |
| Renovation of the pointer newspaper office asaba, oshimili south local … | 165 | ₦43.1m | Oshimili South |
| Installation of solar powered security lighting system within the premi… | 55 | ₦67.3m | Okpe |
| Completion of the construction of ituru road elume, sapele local govern… | 55 | ₦5.06bn | Sapele |
| Construction of okwejeba/jakpa mereje road okpe local government area | 55 | ₦4.44bn | Okpe |
| Construction of ogbelle (oil road) the old okpe road/dafiode street and… | 53 | ₦3.96bn | Okpe |
| Construction and furnishing of administrative building and rank and fil… | 52 | ₦670.1m | Ethiope East |
| Construction of petroleum training institute (p.t.i.) fence (p.t.i. jun… | 49 | ₦118.7m | Okpe |
| Installation of ten (10) units of 5kva/48v solar powered inverter syste… | 47 | ₦135.3m | Warri South |
| Construction of faculty building "b" at the delta state university of s… | 31 | ₦3.18bn | Okpe |
| Upgrade of e-procurement system, e-gps version 2.0 for delta state publ… | 27 | ₦165.0m | Oshimili South |
| Infrastructural intervention at orogodo primary school, agbor in ika so… | 24 | ₦99.7m | Ika South |
| Infrastructural intervention at olisemeka primary school, issele-azagba… | 24 | ₦55.9m | Aniocha North |
| Construction/asphalt overlay of momoh/okere/friday ani streets off ovie… | 21 | ₦574.1m | Uvwie |
| Rehabilitation of bomadi/gbaregolor road, bomadi local government area | 21 | ₦4.49bn | Bomadi |
| Rehabilitation/reconstruction of failed portion of some major roads in … | 19 | ₦683.1m | Oshimili South |
| Construction of orient drive off npa expressway and orient way off nige… | 19 | ₦521.9m | Uvwie |
| Reconstruction and construction of opete road from dsc expressway by pl… | 18 | ₦6.78bn | Udu |
| Construction of 33kv overhead (oh) high voltage (hv) line from emevor t… | 17 | ₦310.0m | Isoko North |
| Rehabilitation/construction of vandalized 33kv line from abbi through e… | 17 | ₦720.0m | Ndokwa West |
| Upgrade of thr existing 500kva (ipp) substation transformer to 1000kva … | 17 | ₦97.2m | Oshimili South |
| Upgrade of infrastructural facilities at i. i. erigbum secondary/commer… | 14 | ₦109.8m | Ika North East |
| Emergency flood control in asaba, oshimili south local government area … | 13 | ₦150.0m | Oshimili South |
| Rehabilitation of chief justice marshal mukoro street/constitution of s… | 9 | ₦595.5m | Ughelli North |
Late is not abandoned, and the register does not say which. A project three days over and one that has not started are both counted here, because the published data establishes only that the date has passed.