Installation of all-in-one led solar powered street lights at naval base in warri south local government area
The contract
- Contract sum
- ₦88,456,321 Official record
- Contractor
- NEXTECH ELECTRICAL SERVICES
- Awarded by
- MINISTRY OF PHYSICAL PLANNING AND URBAN RENEWAL
- Reference
- DSPPC/CNO/1718
- Awarded on
- Sept. 2, 2025
- Due date
- Nov. 28, 2025
- Contract period
- 3 MONTHS
- Reported progress
- 100%
- Category
- Works
- Coordinates
- 5.51410, 5.74018
What it is meant to be
The installation of all-in-one LED solar-powered street lights at the Naval Base in Warri South Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at improving public lighting and security infrastructure within the naval base through the deployment of energy-efficient solar-powered street lighting systems. The scope of work for the streetlights includes site preparation of the base, erection of poles and installation of solar led street lights. The project will enhance security and surveillance, improve nighttime visibility for personnel and visitors, reduce reliance on conventional electricity, lower energy and maintenance costs, promote the use of renewable energy, and contribute to a safer, more sustainable, and efficient operational environment at the Naval Base. -->
What has been checked
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 88456321.25 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 100 | Official record | Delta State Public Procurement Commission · original |
| project_status | Completed | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-09-02 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2025-11-28 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works