How we know this.
Every figure on this site is supposed to trace back to a document somebody published. This page is that claim being checked rather than asserted — for Uvwie (local government area), here is the chain.
The documents behind it
National Population Commission — 2006 Census
records Population census 2006 Official record
records Population census 2006 Official record
OpenDelta — Population projection from the 2006 census
records Population estimate Our calculation
records Population estimate Our calculation
OpenDelta — Data gap register
records School enrolment Not yet published
records School enrolment Not yet published
OpenDelta — Recorded absence — not yet published
records Council chairman Not yet published
records Council chairman Not yet published
Earth Search (Element 84) / ESA Copernicus — Earth Search STAC — Sentinel-2 and Sentinel-1 coverage over Delta State
records Satellite optical passes From satellite
records Satellite optical passes From satellite
Retrieved dates and licence terms for each of these are on the data page.
Directly connected
holds a contract in
Infrastructural intervention at alebon secondary school, effurun, uvwie local g…
holds a contract in
Installation of all-in-one led solar powered streetlights along bright hope str…
holds a contract in
Completion of the abandoned 100 bed maternal and child care centre (mcc), ekpan…
holds a contract in
Procurement and installation of medical equipment and furniture at the new moth…
holds a contract in
Installation of all-in-one led solar powered street lights in warri south west …
holds a contract in
Construction of powerline road and engr. niemogha emmanuel close, effurun, uvwi…
holds a contract in
Infrastructural upgrades at urhobo college, effurun, uvwie local government are…
holds a contract in
Rehabilitation of enerhen police station road/aladja avenue road and drainage i…
holds a contract in
Rehabilitation and asphalt overlay of okorodudu-enerhen road, uvwie local gover…
holds a contract in
Widening of nnpc housing complex road from edjeba junction to the brigde and as…
holds a contract in
Reconstruction of a dual carriage way on the warri/sapele/benin road from the e…
holds a contract in
Construction of orient drive off npa expressway and orient way off nigercat roa…
holds a contract in
Construction/asphalt overlay of momoh/okere/friday ani streets off ovie palace …
holds a contract in
Infrastructural facilities at iteregbi and elegbo secondary schools in uvwie lo…
holds a contract in
Reconstruction of eku-osubi road from p.t.i junction to osubi in uvwie and okpe…
holds a contract in
Construction of ebeya (kamt school)/lolori street, off aka avenue effurun in uv…
holds a contract in
Construction of ejirue/ovhokwo street, ekpan in uvwie local government area
holds a contract in
Construction of mbamalu street off jakpa road in uvwie local government area
holds a contract in
Construction of rt. hon. funkekeme solomon close, off nnpc housing complex road…
holds a contract in
Infrastructural intervention at army day secondary school, effurun in uvwie loc…
sits inside
Delta Central (senatorial district)
Reported by people
sits inside
Opke/Sapele/Uvwie (federal constituency)
Our calculation
sits inside
Uvwie (state constituency)
Read from a document
is recorded by
National Population Commission — 2006 Census
Official record
is recorded by
OpenDelta — Population projection from the 2006 census
Our calculation
Why there is no "show me how these two are connected"
It was built, and then removed. Every LGA holds dozens of projects, so almost any company
reaches almost any politician in a few hops through some unrelated contract that happens
to span a second area. Those paths are real in the data and meaningless in the world, and
a reader shown one would reasonably infer a relationship that does not exist. Traversal
here follows named routes only, each one a question with a defensible answer.