The contract

Contract sum
₦521,884,086 Official record
Contractor
ORUESE INTERNATIONAL NIGERIA ENTERPRISES
Awarded by
WARRI/UVWIE AND ENVIRONS SPECIAL AREA DEVELOPMENT AGENCY
Reference
DSPPC/CNO/2060
Awarded on
March 31, 2026
Due date
Sept. 30, 2026
Contract period
6 MONTHS
Reported progress
20%
Category
Works
Coordinates
5.56387, 5.72981

What it is meant to be

The project involves the construction of Orient Drive and Orient Way, located off NPA Expressway and Nigercat Road, respectively in Ekpan, Uvwie Local Government Area. The road is 470m in length (Orient Drive 130m, Orient Way 340m), drainage, 810m (length), 8m (width). The road is currently in a deplorable condition, it experiences persistent flooding during the rainy season, making it unmotorable and causing severe hardship to residents of the area. The scope of the work for the 470m road includes cathodic protection of the Nigeria Gas pipeline facility. Earthworks, including removal of topsoil and unsuitable materials and filling with sharp sand, concrete works; includes the construction of drainage channels and culverts, crushed stone and Asphalt works comprising binder course ansd wearing course. Upon completion, the road with adequate drainage will address the perenial flooding in the area, improve the general road network and enhance the socio-economic well-geing of residents. -->

What has been checked

Not yet checked No citizen report or inspection is recorded yet.
Awarding body Warri/Uvwie And Environs Special Area Development Agency awarded this contract. Delta State has around 30 boards, agencies and commissions that spend public money outside the ministry structure, each with a head of its own. The names of these office holders are not yet published.

Sources for this record

What we knowValueClassSource
contract_sum 521884086.41 Official record Delta State Public Procurement Commission · original
project_progress 20 Official record Delta State Public Procurement Commission · original
project_status Ongoing Official record Delta State Public Procurement Commission · original
contract_awarded_on 2026-03-31 Official record Delta State Public Procurement Commission · original
expected_completion 2026-09-30 Official record Delta State Public Procurement Commission · original
project_field_evidence not yet published Not yet published OpenDelta

What people who have been there say

Reports from people who have visited, alongside the register's progress figure.

No reports on this project yet

No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published

How we know this

Responses to this record

Published as received, in the sender's words, without editing for length.

No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.

Respond to this record How the right of reply works

Also here