Construction of aboh-akarai road with a bridge across the okiri river, ndokwa east local government area.
The contract
- Contract sum
- ₦29,844,922,890 Official record
- Contractor
- LEBTECH CONSTRUCTION LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1697
- Awarded on
- July 23, 2025
- Due date
- June 23, 2026
- Contract period
- 12 MONTHS
- Reported progress
- 35%
- Past its date by
- 63 days
- Category
- Works
- Coordinates
- 5.58868, 6.51431
What it is meant to be
The project entails the construction of the Aboh–Akarai Road, including a bridge across the Okiri River, in Ndokwa East Local Government Area. The scope of work for the 10.90km length, 7.3m width of pavement, 100m span bridge with 2.5m should includes site clearance, removal of topsoil, unsuitable materials, earth fill, 150mm thick crushed stone base course, grassed shoulders, demolition of undersized existing concrete drains, construction of concrete drains, slabs, construction of non-navigational 100m length of reinforced cconcrete birdge consisting of 5Nos. spans of 20m longitudinal concrete beams, concrete culverts, rigid pavement and surfacing with one layer of asphalt. Upon completion, the road and bridge will significantly improve accessibility between Aboh and Akarai, reducing travel time and eliminating challenges associated with river crossings. It will enhance the movement of goods and services, improve access to essential facilities, and support socio-economic development in the area. Ultimately, the project will contribute to improved living standards and sustainable regional development. -->
What has been checked
The ground at these coordinates
The satellite could not see this site. Cloud hid this site, so a satellite comparison is not possible. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 29844922889.8 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 35 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-07-23 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-06-23 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 1 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.