Flood and erosion control measures at beneku/okpai road in ndokwa east local government area.
The contract
- Contract sum
- ₦420,800,553 Official record
- Contractor
- DALMAS ENGINEERING EXPRESSION LTD
- Awarded by
- MINISTRY OF WORKS (HIGHWAYS & URBAN ROADS)
- Reference
- DSPPC/CNO/1643
- Awarded on
- May 22, 2025
- Due date
- Aug. 22, 2025
- Contract period
- 3 MONTHS
- Reported progress
- 100%
- Category
- Works
- Coordinates
- 5.65115, 6.53564
What it is meant to be
The Flood and Erosion Control Measures at Beneku/Okpai Road, by the Governor of Delta State, His Excellency Rt. Hon. Sheriff Oborevwori, in this and beyond, are aimed at addressing flooding and erosion challenges affecting the road and surrounding communities. The scope of work for the 600 metres length includes site clearing, earthfill of the embankment, concrete works involving retaining walls, ramps, steps, provision of a toe beam, chutes and concreting of the slope of the embankment to protect the embankment fromm eroding. This intervention is expected to enhance road durability, improve accessibility and safety for commuters, and reduce environmental damage caused by flooding and erosion. It also contributes to sustainable infrastructural and environmental development within the local government area and beyond. -->
What has been checked
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 420800553.13 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 100 | Official record | Delta State Public Procurement Commission · original |
| project_status | Completed | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-05-22 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2025-08-22 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works