Oshimili South › Project
Erosion control measures at the asaba airport, oshimili south local government area
The contract
- Contract sum
- ₦3,698,437,928 Official record
- Contractor
- LEVANT CONSTRUCTION LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1998
- Awarded on
- Feb. 9, 2026
- Due date
- Feb. 9, 2027
- Contract period
- 12 MONTHS
- Reported progress
- 15%
- Category
- Works
- Coordinates
- 6.20777, 6.70181
What it is meant to be
The project **“Erosion Control Measures at the Asaba Airport, Oshimili South Local Government Area”** aligns with the following Sustainable Development Goals (SDGs): * **SDG 9 – Industry, Innovation and Infrastructure:** as it protects critical transport infrastructure from environmental degradation. * **SDG 11 – Sustainable Cities and Communities:** due to its role in enhancing environmental safety and resilience. * **SDG 13 – Climate Action (secondary relevance):** by addressing erosion and mitigating environmental impacts associated with climate change. --- ### **Project Description** The project involves the implementation of erosion control measures at Asaba Airport to protect the facility and surrounding areas from environmental degradation. It includes the construction of drainage channels, embankments, and other protective structures designed to control surface runoff and prevent soil erosion. These measures are necessary to safeguard the integrity of the airport infrastructure and ensure safe operations. The project is expected to reduce the risk of erosion-related damage, improve environmental sustainability, and enhance the safety of airport operations. It will also help
What has been checked
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 3698437928.13 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 15 | Official record | Delta State Public Procurement Commission · original |
| project_status | New Projects | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-02-09 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2027-02-09 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works