OpenDeltaDelta State

Oshimili South › Project

Construction of flood control measures on summit road through nwelish street, st, patrick's college, west-end mixed secondary school, uche medua igeh close to amilimocha stream, oshimili south lga

Oshimili South · Asaba, Delta State

Budget
Award
Build
Verified

The contract

Contract sum
₦10,523,320,608 Official record
Contractor
CCECC
Awarded by
STATE TENDERS BOARD
Reference
DSPPC/CNO/1740
Awarded on
Aug. 19, 2025
Due date
Oct. 19, 2026
Contract period
18 MONTHS
Reported progress
70%
Category
Works
Coordinates
6.21061, 6.68863

What it is meant to be

The construction of flood control measures along Summit Road through Nwelish Street, St. Patrick's College, West-End Mixed Secondary School, and Uche Medua Igeh Close to Amilimocha Stream in Oshimili South Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at controlling flooding and improving stormwater management within the affected areas. The scope of work includes construction of a total length of 1,460m of open u-channel of size 1.35m by 1.5m (aveg. depth) varying depth on both sides of summit road starting from DBS road junction to DLA junction. The project will improve drainage and water-flow management, reduce the risk of flooding and erosion, protect roads, schools, homes and other infrastructure, improve environmental safety, and contribute to a more resilient and sustainable community in Oshimili South Local Government Area. -->

What has been checked

Not yet checked No citizen report or inspection is recorded yet.

The ground at these coordinates

The satellite could not see this site. Cloud hid this site, so a satellite comparison is not possible. From satellite

Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.

Awarding body State Tenders Board awarded this contract. Delta State has around 30 boards, agencies and commissions that spend public money outside the ministry structure, each with a head of its own. The names of these office holders are not yet published.

Sources for this record

What we knowValueClassSource
contract_sum 10523320608.49 Official record Delta State Public Procurement Commission · original
project_progress 70 Official record Delta State Public Procurement Commission · original
project_status Ongoing Official record Delta State Public Procurement Commission · original
contract_awarded_on 2025-08-19 Official record Delta State Public Procurement Commission · original
expected_completion 2026-10-19 Official record Delta State Public Procurement Commission · original
project_field_evidence not yet published Not yet published OpenDelta
satellite_clear_looks 1 From satellite Copernicus Sentinel-2 via Earth Search (Element 84) · original

What people who have been there say

Reports from people who have visited, alongside the register's progress figure.

No reports on this project yet

No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published

How we know this

Responses to this record

Published as received, in the sender's words, without editing for length.

No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.