Flood and erosion control measures at dennis osadebey way from traffic light to abraka junction by benin-onitsha express way asaba, oshimili south local government area.

Oshimili South · Dennis Osadebey, Asaba, Oshimili South Local Government Area.

Budget
Award
Build
Verified

The contract

Contract sum
₦1,554,635,438 Official record
Contractor
ROADWELL CONTRACTING LIMITED
Awarded by
STATE TENDERS BOARD
Reference
DSPPC/CNO/1962
Awarded on
Jan. 15, 2026
Due date
June 15, 2026
Contract period
6 MONTHS
Reported progress
45%
Past its date by
71 days
Category
Works
Coordinates
6.18628, 6.74468

What it is meant to be

The Flood and Erosion Control Measures at Dennis Osadebey Way from Traffic Light to Abraka Junction by Benin–Onitsha Express Way, Asaba, Oshimili South Local Government Area, is designed to address persistent flooding and soil erosion challenges affecting the roadway and surrounding communities. The project involves the construction and rehabilitation of drainage channels, culverts, embankments, and erosion protection structures to ensure proper stormwater management and prevent further deterioration of the road infrastructure. These interventions aim to enhance the durability and safety of this major transportation corridor. Furthermore, the project seeks to safeguard lives, properties, and commercial activities within the area by minimizing disruptions caused by seasonal flooding. Improved drainage and erosion control will enhance traffic flow, reduce maintenance costs, and promote environmental sustainability. Ultimately, the initiative contributes to urban resilience, infrastructure stability, and long-term socio-economic development within Oshimili South Local Government Area and Delta State at large. -->

What has been checked

Not yet checked No citizen report or inspection is recorded yet.

The ground at these coordinates

Satellite view of the site on 2026-01-06
Before the award 2026-01-06 · 2.4% of the site under cloud
Satellite view of the site on 2026-02-05
Since the award 2026-02-05 · 0.4% of the site under cloud

Two clear looks at the coordinate the register publishes, 2.56 km across. Ten metres to a pixel. This shows whether the ground at a published coordinate changed between two dates. It does not show what was built, who built it, or whether it works, and it is not field evidence. From satellite

Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.

Awarding body State Tenders Board awarded this contract. Delta State has around 30 boards, agencies and commissions that spend public money outside the ministry structure, each with a head of its own. The names of these office holders are not yet published.

Sources for this record

What we knowValueClassSource
contract_sum 1554635437.5 Official record Delta State Public Procurement Commission · original
project_progress 45 Official record Delta State Public Procurement Commission · original
project_status Ongoing Official record Delta State Public Procurement Commission · original
contract_awarded_on 2026-01-15 Official record Delta State Public Procurement Commission · original
expected_completion 2026-06-15 Official record Delta State Public Procurement Commission · original
project_field_evidence not yet published Not yet published OpenDelta
satellite_clear_looks 2 From satellite Copernicus Sentinel-2 via Earth Search (Element 84) · original

What people who have been there say

Reports from people who have visited, alongside the register's progress figure.

No reports on this project yet

No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published

How we know this

Responses to this record

Published as received, in the sender's words, without editing for length.

No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.

Respond to this record How the right of reply works