Oshimili South › Project
The reactivation and installation works of solar streetlight at cable point, asaba, oshimili south local government area.
The contract
- Contract sum
- ₦57,604,950 Official record
- Contractor
- QUANTUN ENERGY SERVICES LIMITED
- Awarded by
- MINISTRY OF ENERGY
- Reference
- DSPPC/CNO/1532
- Awarded on
- March 17, 2025
- Due date
- May 19, 2025
- Contract period
- 12 WEEKS
- Reported progress
- 100%
- Category
- Goods
- Coordinates
- 6.19466, 6.74111
What it is meant to be
The project entails the reactivation of existing non-functional solar streetlights and the installation of additional solar-powered lighting units along Cable Point in Asaba, Oshimili South Local Government Area. The works include inspection and repair of solar panels, batteries, charge controllers, poles, and luminaires of previously installed systems, as well as the supply and erection of new solar streetlight assemblies at identified dark spots. The intervention is designed to restore and expand reliable, off-grid public lighting using renewable solar energy technology suited to the local environment. Upon completion, the upgraded solar streetlighting network will significantly improve nighttime visibility, pedestrian and vehicular safety, and security conditions within the Cable Point corridor and adjoining neighborhoods. The project also reduces public energy costs and environmental impact by replacing or supplementing grid-dependent lighting with clean energy solutions. Overall, the initiative contributes to safer, more resilient urban infrastructure and supports sustainable development objectives in Asaba and the wider Oshimili South area. -->
What has been checked
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 57604950.0 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 100 | Official record | Delta State Public Procurement Commission · original |
| project_status | Completed | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-03-17 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2025-05-19 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works