Oshimili South › Project
Replacement of burnt 2mva 11/0.400kv distribution transformer at the prof chike chike edozien secretariat asaba, oshimili south local government area.
The contract
- Contract sum
- ₦75,000,000 Official record
- Contractor
- PRESNOL GLOBAL ENTERPRISE
- Awarded by
- MINISTRY OF ENERGY
- Reference
- DSPPC/CNO/1652
- Awarded on
- June 10, 2025
- Due date
- Aug. 28, 2025
- Contract period
- 12 WEEKS
- Reported progress
- 100%
- Category
- Goods
- Coordinates
- 6.21861, 6.68473
What it is meant to be
The project involves the removal of the burnt 2 MVA, 11/0.400 KV distribution transformer and the supply, installation, and commissioning of a new replacement unit at the Prof. Chike Chike Edozien Secretariat complex in Asaba, Oshimili South Local Government Area. The scope includes dismantling and safe disposal of the damaged transformer, installation of a new transformer on the existing plinth, replacement or upgrade of associated high- and low-voltage switchgear, cabling, protection systems, and earthing arrangements, as well as testing and energization to restore full electrical distribution capacity across the secretariat. Upon completion, the new transformer will reinstate stable and adequate power supply to offices, administrative departments, and support services within the secretariat, thereby improving operational efficiency and continuity of government services. The intervention will reduce downtime, prevent further electrical failures, and enhance safety and reliability of the power distribution network serving the complex. Overall, the project strengthens institutional infrastructure and supports effective governance and service delivery in Asaba and Oshimili South Loc
What has been checked
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 75000000.0 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 100 | Official record | Delta State Public Procurement Commission · original |
| project_status | Completed | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-06-10 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2025-08-28 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works