Ughelli North › Project
Rehabilitation of arho road by heroes of faith church ughelli, ughelli north local government area.
The contract
- Contract sum
- ₦1,106,099,626 Official record
- Contractor
- PRENAK GLOBAL RESOURCES LTD
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1709
- Awarded on
- Aug. 5, 2025
- Due date
- July 5, 2026
- Contract period
- 18 MONTHS
- Reported progress
- 40%
- Past its date by
- 51 days
- Category
- Works
- Coordinates
- 5.50019, 5.99383
What it is meant to be
The project involves the rehabilitation of Arho Road located near the Heroes of Faith Church in Ughelli North Local Government Area. The scope of the 1,327m length, 150m x 7.3m concrete pavement, 7.3m pavement width includes scarification of failed existing asphalt, removal of unsuitable materials, sharp sand fill, crushing stone base, concrete drain, culverts, access slabs, concrete rigid pavement at two sections, and asphalt pavement surfacing consisting of two layers of asphalt. The aim is to restore the road to a safe, durable, and motorable condition for both vehicular and pedestrian use. Upon completion, the rehabilitated road will improve accessibility within the area, reduce travel time, and enhance safety for residents and commuters. It will also support economic activities by facilitating easier movement of goods and services, particularly for businesses operating around the corridor. Overall, the project will contribute to improved infrastructure, better living conditions, and sustainable development in the community. -->
What has been checked
The ground at these coordinates
One of these looks is disputed and we are not calling it a comparison. The archive's own classifier reports the site clear; the picture is full of near-white pixels anyway. That is either low cloud the classifier missed or bare ground, and nothing here can tell you which — which is exactly why a picture from orbit is not a site visit. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 1106099625.68 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 40 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-08-05 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-07-05 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 1 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works