Oshimili South › Project
Cutting of hills at the asaba airport, oshimili south local government area
The contract
- Contract sum
- ₦6,854,063,582 Official record
- Contractor
- LEVANT CONSTRUCTION LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/2094
- Awarded on
- April 29, 2026
- Due date
- March 29, 2027
- Contract period
- 12 MONTHS
- Reported progress
- 0%
- Category
- Works
- Coordinates
- 6.20742, 6.66089
What it is meant to be
The cutting of hills at Asaba Airport in Oshimili South Local Government Area by the Governor, Rt. Hon. Sheriff Oborevwori, is aimed at improving the safety, accessibility, and operational efficiency of the airport. The hill on both sides of the Airport Runway comprises of 1.15km length of hill on the right-hand side (RHS) with varying heights of between 5m - 10m and 1.3km length of hill on the left-hand side with varying heights of between 12m - 15m from the cliff base. The scope of works for cutting of the hill includes site clearance, removal of topsoil, earthworks comprising cutting of the hill, grassing and stone pitching. This intervention will enhance aviation safety, ensure smoother aircraft take-off and landing, and support the expansion of airport infrastructure. It will also contribute to increased economic activities by improving connectivity, attracting investments, and promoting regional development within and beyond Asaba. -->
What has been checked
The ground at these coordinates
Two clear looks at the coordinate the register publishes, 2.56 km across. Ten metres to a pixel. This shows whether the ground at a published coordinate changed between two dates. It does not show what was built, who built it, or whether it works, and it is not field evidence. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 6854063582.5 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 0 | Official record | Delta State Public Procurement Commission · original |
| project_status | New Projects | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-04-29 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2027-03-29 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 2 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works