Ughelli North › Project
Construction of okowa crescent, off ughelli/patani expressway, ughelli in ughelli north local government area
The contract
- Contract sum
- ₦797,093,902 Official record
- Contractor
- OBAKPOR J. U. CONSTRUCTION COMPANY
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1751
- Awarded on
- Sept. 4, 2025
- Due date
- Aug. 4, 2026
- Contract period
- 12 MONTHS
- Reported progress
- 40%
- Past its date by
- 21 days
- Category
- Works
- Coordinates
- 5.50019, 5.99383
What it is meant to be
The construction of Okowa Crescent, off Ughelli/Patani Expressway in Ughelli North Local Government Area, under the administration of Rt. Hon. Sheriff Oborevwori, is aimed at developing a durable and well-structured road network to improve accessibility within the area. The scope of work for the 550m length, 10m average clearance width and 7m pavement width of the road consists of site clearance, removal of topsoil and unsuitable materials, sharp sand fill, crushed stone bone; concrete works consisting of construction of drains, culverts, access slabs; pavement surfacing consisting of one layer of asphalt binder course with thermoplastic road markings. This intervention will enhance transportation, reduce traffic congestion, and improve connectivity between residential and commercial areas. It will also facilitate the movement of goods and services, promote economic activities, and contribute to the overall socio-economic development of the community. -->
What has been checked
The ground at these coordinates
One of these looks is disputed and we are not calling it a comparison. The archive's own classifier reports the site clear; the picture is full of near-white pixels anyway. That is either low cloud the classifier missed or bare ground, and nothing here can tell you which — which is exactly why a picture from orbit is not a site visit. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 797093902.5 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 40 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-09-04 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-08-04 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 1 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works