Oshimili North › Project
Construction of internal roads at ugbolu hill top government layout (phase i), ugbolu, oshimili north local government area
The contract
- Contract sum
- ₦4,371,418,736 Official record
- Contractor
- LEBTECH CONSTRUCTION LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1599
- Awarded on
- Sept. 2, 2025
- Due date
- Aug. 2, 2026
- Contract period
- 12 MONTHS
- Reported progress
- 85%
- Past its date by
- 23 days
- Category
- Works
- Coordinates
- 6.30898, 6.68787
What it is meant to be
The construction of internal roads at Ugbolu Hill Top Government Layout (Phase I), Ugbolu, in Oshimili North Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at improving transportation infrastructure and accessibility within the government layout. The project includes 3,628m length and 10m width. The scope of work for the 3,628m length of road includes site clearance and earthworks comprising of removal of unsuitable materials, lateritic sand fill, laying of crushed stone base course; concrete works comprising of drains, access slabs, kerbs, box culverts, pavement surfacing consisting of two layers of Hot Rolled Asphalt (HRA) and thermoplastic road marking. The project will provide improved and durable internal roads, facilitate the movement of residents and goods, enhance access to residential areas and public facilities, reduce transportation difficulties, support socio-economic activities, and contribute to orderly urban development and improved living conditions in Oshimili North Local Government Area. -->
What has been checked
The ground at these coordinates
The satellite could not see this site. 40 scenes offered, 10 checked, the site clouded over in every one. Cloud hid this site, so a satellite comparison is not possible. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 4371418735.83 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 85 | Official record | Delta State Public Procurement Commission · original |
| project_status | Completed | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-09-02 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-08-02 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 0 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.