Aniocha North › Project
Construction of internal roads/drainage at the nysc orientation camp, issele uku in aniocha north local government area (phase ll)
The contract
- Contract sum
- ₦1,520,932,387 Official record
- Contractor
- LEBTECH CONSTRUCTION LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1611
- Awarded on
- Sept. 2, 2025
- Due date
- Aug. 2, 2026
- Contract period
- 12 MONTHS
- Reported progress
- 65%
- Past its date by
- 23 days
- Category
- Works
- Coordinates
- 6.32179, 6.46596
What it is meant to be
The project involves constructing internal roads and drainage systems within the NYSC Orientation Camp in Issele-Uku as part of Phase II development. It includes road construction, grading, surfacing, and the installation of drainage channels to ensure effective water management and prevent flooding within the camp environment. The project is expected to improve mobility and accessibility within the camp, enhance safety for corps members and staff, and create a more organized and conducive environment. It will also reduce the impact of erosion and flooding, thereby preserving infrastructure and promoting sustainability. Additionally, the project will contribute to overall facility development and support efficient camp operations. -->
What has been checked
The ground at these coordinates
Two clear looks at the coordinate the register publishes, 2.56 km across. Ten metres to a pixel. This shows whether the ground at a published coordinate changed between two dates. It does not show what was built, who built it, or whether it works, and it is not field evidence. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 1520932386.87 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 65 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-09-02 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-08-02 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 2 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works