Ethiope West › Project
Completion of the construction of unoghovo road from benin expressway to ovade oghara, ethiope west local government area.
The contract
- Contract sum
- ₦2,140,126,085 Official record
- Contractor
- MEDIAC RESOURCE LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1755
- Awarded on
- Sept. 4, 2025
- Due date
- Aug. 4, 2026
- Contract period
- 12 MONTHS
- Reported progress
- 55%
- Past its date by
- 21 days
- Category
- Works
- Coordinates
- 6.00454, 5.70169
What it is meant to be
The completion of the construction of Unoghovo Road from the Benin Expressway to Ovade Oghara in Ethiope West Local Government Area is aimed at providing a durable and motorable access route that connects Ovade community to the major regional highway network. The project involves finishing outstanding earthworks, pavement construction, drainage installation, and road surfacing to transform the partially completed route into an all-weather road. This will address long-standing mobility challenges, especially during the rainy season when sections of the road become difficult or impassable. Upon completion, the road will significantly improve transportation of people, goods, and agricultural produce between Ovade Oghara and adjoining towns, while enhancing access to markets, schools, healthcare facilities, and economic opportunities. The improved connectivity is expected to stimulate local commerce, reduce travel time and vehicle operating costs, and support socio-economic development in Ethiope West LGA. Ultimately, the project will provide a sustainable transport asset that strengthens rural-urban linkages and improves the quality of life for residents and road users. -->
What has been checked
The ground at these coordinates
Two clear looks at the coordinate the register publishes, 2.56 km across. Ten metres to a pixel. This shows whether the ground at a published coordinate changed between two dates. It does not show what was built, who built it, or whether it works, and it is not field evidence. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 2140126084.69 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 55 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-09-04 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-08-04 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 2 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works