Completion of the construction of unoghovo road from benin expressway to ovade oghara, ethiope west local government area.

Ethiope West · Oghara, Ethiope West Local Government Area.

Budget
Award
Build
Verified

The contract

Contract sum
₦2,140,126,085 Official record
Contractor
MEDIAC RESOURCE LIMITED
Awarded by
STATE TENDERS BOARD
Reference
DSPPC/CNO/1755
Awarded on
Sept. 4, 2025
Due date
Aug. 4, 2026
Contract period
12 MONTHS
Reported progress
55%
Past its date by
21 days
Category
Works
Coordinates
6.00454, 5.70169

What it is meant to be

The completion of the construction of Unoghovo Road from the Benin Expressway to Ovade Oghara in Ethiope West Local Government Area is aimed at providing a durable and motorable access route that connects Ovade community to the major regional highway network. The project involves finishing outstanding earthworks, pavement construction, drainage installation, and road surfacing to transform the partially completed route into an all-weather road. This will address long-standing mobility challenges, especially during the rainy season when sections of the road become difficult or impassable. Upon completion, the road will significantly improve transportation of people, goods, and agricultural produce between Ovade Oghara and adjoining towns, while enhancing access to markets, schools, healthcare facilities, and economic opportunities. The improved connectivity is expected to stimulate local commerce, reduce travel time and vehicle operating costs, and support socio-economic development in Ethiope West LGA. Ultimately, the project will provide a sustainable transport asset that strengthens rural-urban linkages and improves the quality of life for residents and road users. -->

What has been checked

Not yet checked No citizen report or inspection is recorded yet.

The ground at these coordinates

Satellite view of the site on 2025-01-11
Before the award 2025-01-11 · 0.0% of the site under cloud
Satellite view of the site on 2025-12-04
Since the award 2025-12-04 · 0.0% of the site under cloud

Two clear looks at the coordinate the register publishes, 2.56 km across. Ten metres to a pixel. This shows whether the ground at a published coordinate changed between two dates. It does not show what was built, who built it, or whether it works, and it is not field evidence. From satellite

Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.

Awarding body State Tenders Board awarded this contract. Delta State has around 30 boards, agencies and commissions that spend public money outside the ministry structure, each with a head of its own. The names of these office holders are not yet published.

Sources for this record

What we knowValueClassSource
contract_sum 2140126084.69 Official record Delta State Public Procurement Commission · original
project_progress 55 Official record Delta State Public Procurement Commission · original
project_status Ongoing Official record Delta State Public Procurement Commission · original
contract_awarded_on 2025-09-04 Official record Delta State Public Procurement Commission · original
expected_completion 2026-08-04 Official record Delta State Public Procurement Commission · original
project_field_evidence not yet published Not yet published OpenDelta
satellite_clear_looks 2 From satellite Copernicus Sentinel-2 via Earth Search (Element 84) · original

What people who have been there say

Reports from people who have visited, alongside the register's progress figure.

No reports on this project yet

No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published

How we know this

Responses to this record

Published as received, in the sender's words, without editing for length.

No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.

Respond to this record How the right of reply works

Also here