Ika South › Project
Construction and rehabilitation of ekuku-agbor/okpe-abavo road (phase ii), ika south local government area
The contract
- Contract sum
- ₦11,291,497,466 Official record
- Contractor
- CENTDRAKEN GLOBAL SERVICES
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/2092
- Awarded on
- April 23, 2026
- Due date
- March 23, 2027
- Contract period
- 18 MONTHS
- Reported progress
- 0%
- Category
- Works
- Coordinates
- 6.08679, 6.30400
What it is meant to be
The project involves the construction and rehabilitation of the Ekuku-Agbor/Okpe-Abavo Road (Phase II), aimed at restoring and upgrading the road to a durable standard. Length of road, 13.786km, total length of drains, 8,900lm, average pavement width, 7.3m, shoulder width, 2m x 2. The scope of work for the road project includes site clearance, earthworks involving the removal of topsoil and filling with approved lateritic materials, scarification of failed asphalt, concrete works comprising drains and culverts, pavement surfacing consisting of crushed stone base, two layers of Hot Rolled Asphalt (HRA) and thermoplastinc road marking. This intervention will improve transportation, enhance connectivity between communities, and reduce travel time. It will also support economic activities and contribute to sustainable development in Ika South Local Government Area. -->
What has been checked
The ground at these coordinates
Two clear looks at the coordinate the register publishes, 2.56 km across. Ten metres to a pixel. This shows whether the ground at a published coordinate changed between two dates. It does not show what was built, who built it, or whether it works, and it is not field evidence. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 11291497465.85 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 0 | Official record | Delta State Public Procurement Commission · original |
| project_status | New Projects | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-04-23 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2027-03-23 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 2 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works