Burutu › Project
Completion of the construction of torugbene-ojobo road (phase ii), section b: from the end of section 1 to ojobo, burutu local government area.
The contract
- Contract sum
- ₦32,888,855,978 Official record
- Contractor
- SETRACO (NIGERIA) LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/2110
- Awarded on
- May 7, 2026
- Due date
- April 7, 2028
- Contract period
- 24 MONTHS
- Reported progress
- 0%
- Category
- Works
- Coordinates
- 5.02929, 5.68459
What it is meant to be
The completion of the construction of the Torugbene–Ojobo Road (Phase II), Section B, from the end of Section 1 to Ojobo in Burutu Local Government Area, under the administration of Rt. Hon. Sheriff Oborevwori, is aimed at finalizing an important transportation project that links communities within the riverine area. The project involves 9,463m length of road, 13m average clearance width, 10m average pavement width and 30m bridge length. The scope of works for the 9,463m length of road includes site clearance, removal of topsoil and unsuitable materials, sharp sand fill, crushed stone base, drainage construction, reinforcement of the road base, and asphalt surfacing to provide a durable and accessible roadway. This intervention will significantly improve transportation, ease the movement of people and goods, and reduce travel difficulties within the benefiting communities. It will also support economic activities such as fishing, farming, and local trade, improve access to social amenities, and contribute to the socio-economic development of the area. -->
What has been checked
The ground at these coordinates
The satellite could not see this site. 7 scenes offered, 7 checked, the site clouded over in every one. Cloud hid this site, so a satellite comparison is not possible. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 32888855978.49 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 0 | Official record | Delta State Public Procurement Commission · original |
| project_status | New Projects | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-05-07 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2028-04-07 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 1 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works