Okpe › Project
Rehabilitation/construction of okwetolor/okobia/aragba road, with spur to okogume (phase ii), okpe local government area
The contract
- Contract sum
- ₦13,397,501,393 Official record
- Contractor
- Y & W INTERNATIONAL LIMITED
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/1602
- Awarded on
- June 20, 2025
- Due date
- Dec. 31, 2026
- Contract period
- 18 MONTHS
- Reported progress
- 35%
- Category
- Works
- Coordinates
- 5.72614, 6.13944
What it is meant to be
The rehabilitation and construction of Okwetolor–Okobia–Aragba Road with a spur to Okogume (Phase II) in Okpe Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at improving road connectivity and transportation through the rehabilitation and construction of the road and its connecting spur. The road includes a 12,565m length with a 9.3m pavement width. The scope of work includes site clearance, scarification of old asphalt surface, removal of top soil and unsuitable materials, sharp sand filling, sharp sand for replacement of topsoil and unsuitable material removal, sharp sand filling, shoulder grassing, desilting of existing drains, demolition of old undersized drains, concret box culverts, concrete slabs and pavement surfacing consisting of two layers of asphalts, 500mm HRA binder course and 40mm HRA wearing course. The project will enhance the movement of people, goods, and services, improve access to surrounding communities, stimulate economic and social activities and contribute to sustainable infrastructure and rural development in Okpe Local Government Area. -->
What has been checked
The ground at these coordinates
One of these looks is disputed and we are not calling it a comparison. The archive's own classifier reports the site clear; the picture is full of near-white pixels anyway. That is either low cloud the classifier missed or bare ground, and nothing here can tell you which — which is exactly why a picture from orbit is not a site visit. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 13397501393.48 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 35 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2025-06-20 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2026-12-31 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 1 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works