OpenDeltaDelta State

Okpe › Project

Rehabilitation/construction of okwetolor/okobia/aragba road, with spur to okogume (phase ii), okpe local government area

Okpe · Okwetolor/Okobia/Aragba Road

Budget
Award
Build
Verified

The contract

Contract sum
₦13,397,501,393 Official record
Contractor
Y & W INTERNATIONAL LIMITED
Awarded by
STATE TENDERS BOARD
Reference
DSPPC/CNO/1602
Awarded on
June 20, 2025
Due date
Dec. 31, 2026
Contract period
18 MONTHS
Reported progress
35%
Category
Works
Coordinates
5.72614, 6.13944

What it is meant to be

The rehabilitation and construction of Okwetolor–Okobia–Aragba Road with a spur to Okogume (Phase II) in Okpe Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at improving road connectivity and transportation through the rehabilitation and construction of the road and its connecting spur. The road includes a 12,565m length with a 9.3m pavement width. The scope of work includes site clearance, scarification of old asphalt surface, removal of top soil and unsuitable materials, sharp sand filling, sharp sand for replacement of topsoil and unsuitable material removal, sharp sand filling, shoulder grassing, desilting of existing drains, demolition of old undersized drains, concret box culverts, concrete slabs and pavement surfacing consisting of two layers of asphalts, 500mm HRA binder course and 40mm HRA wearing course. The project will enhance the movement of people, goods, and services, improve access to surrounding communities, stimulate economic and social activities and contribute to sustainable infrastructure and rural development in Okpe Local Government Area. -->

What has been checked

Not yet checked No citizen report or inspection is recorded yet.

The ground at these coordinates

Satellite view of the site on 2025-01-11
Before the award 2025-01-11
Satellite view of the site on 2026-03-12
Since the award 2026-03-12 · unclear

One of these looks is disputed and we are not calling it a comparison. The archive's own classifier reports the site clear; the picture is full of near-white pixels anyway. That is either low cloud the classifier missed or bare ground, and nothing here can tell you which — which is exactly why a picture from orbit is not a site visit. From satellite

Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.

Awarding body State Tenders Board awarded this contract. Delta State has around 30 boards, agencies and commissions that spend public money outside the ministry structure, each with a head of its own. The names of these office holders are not yet published.

Sources for this record

What we knowValueClassSource
contract_sum 13397501393.48 Official record Delta State Public Procurement Commission · original
project_progress 35 Official record Delta State Public Procurement Commission · original
project_status Ongoing Official record Delta State Public Procurement Commission · original
contract_awarded_on 2025-06-20 Official record Delta State Public Procurement Commission · original
expected_completion 2026-12-31 Official record Delta State Public Procurement Commission · original
project_field_evidence not yet published Not yet published OpenDelta
satellite_clear_looks 1 From satellite Copernicus Sentinel-2 via Earth Search (Element 84) · original

What people who have been there say

Reports from people who have visited, alongside the register's progress figure.

No reports on this project yet

No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published

How we know this

Responses to this record

Published as received, in the sender's words, without editing for length.

No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.

Respond to this record How the right of reply works