Okpe › Project
Reconstruction of orerokpe-eku road (section i) from ugolo junction at km 0+000-km 13 + 000, okpe and ethiope east local government area
The contract
- Contract sum
- ₦22,610,018,052 Official record
- Contractor
- CCECC
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/2137.
- Awarded on
- June 2, 2026
- Due date
- May 2, 2027
- Contract period
- 12 MONTHS
- Reported progress
- 5%
- Category
- Works
- Coordinates
- 5.63972, 5.89079
What it is meant to be
The reconstruction of the Orerokpe–Eku Road (Section I), from Ugolo Junction (Km 0+000) to Km 13+000 in Okpe Local Government Area and Ethiope East Local Government Area, by Rt. Hon. Sheriff Oborevwori. The project involvess 13,000m total length of road, 13.5m pavement width (binder), 8m pavement width (wearing), 2.75m x 2 shoulders, 8.0m pavement width and 5,000m side drain. The scope of the project includes removal of unsuitable materials, scarification of failed existing bituminous surfacing, scarification and pulverization of existing bituminous surfacing on the stable sections as fillings, sharp sand filling, soil stabilization, concrete works comprising of crushed stone base and asphaltic binder on 13.5m carriageway width inclusive of the shoulders and asphaltic wearing course on the 8m carriageway width. The project will reduce vehicle operating costs, enhance connectivity between communities and markets, stimulate trade and investment, improve access to essential social services, and promote sustainable infrastructure development and economic growth across Okpe and Ethiope East Local Government Areas. -->
What has been checked
The ground at these coordinates
The satellite could not see this site. 4 scenes offered, 4 checked, the site clouded over in every one. Cloud hid this site, so a satellite comparison is not possible. From satellite
Copernicus Sentinel-2, rendered by the archive. A picture of the ground is not a site visit: it cannot say what was built, who built it, or whether it works.
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 22610018052.44 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 5 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-06-02 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2027-05-02 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
| satellite_clear_looks | 1 | From satellite | Copernicus Sentinel-2 via Earth Search (Element 84) · original |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works