Okpe › Project
Reconstruction of egbeleku junction adeje to warri/sapele road, okpe local government area
The contract
- Contract sum
- ₦1,415,914,455 Official record
- Contractor
- EMIMARVIS GLOBAL RESOURCES
- Awarded by
- STATE TENDERS BOARD
- Reference
- DSPPC/CNO/2170
- Awarded on
- June 19, 2026
- Due date
- May 19, 2027
- Contract period
- 12 MONTHS
- Reported progress
- 5%
- Category
- Works
- Coordinates
- 5.68810, 5.76422
What it is meant to be
The reconstruction of Egbeleku Junction Adeje to Warri–Sapele Road in Okpe Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at improving a key road link that enhances connectivity between communities and the Warri–Sapele transport corridor. The road has 1,198m length, 3 x 2m clearance width and 7.3m pavement width. The scope of work includes site clearance, removal of unsuitable materials, sharp river sand fill, concrete works comprising of concrete drains, culverts, access slabs and pavement surfacing consisting of crushed stone base and two layers of hot rolled asphalt (HRA) as well as thermoplastic road marking. The project will provide a safer and more durable road network, reduce vehicle operating costs, improve access to residential. -->
What has been checked
Sources for this record
| What we know | Value | Class | Source |
|---|---|---|---|
| contract_sum | 1415914454.64 | Official record | Delta State Public Procurement Commission · original |
| project_progress | 5 | Official record | Delta State Public Procurement Commission · original |
| project_status | Ongoing | Official record | Delta State Public Procurement Commission · original |
| contract_awarded_on | 2026-06-19 | Official record | Delta State Public Procurement Commission · original |
| expected_completion | 2027-05-19 | Official record | Delta State Public Procurement Commission · original |
| project_field_evidence | not yet published | Not yet published | OpenDelta |
What people who have been there say
Reports from people who have visited, alongside the register's progress figure.
No reports on this project yet
No independent check is recorded yet. If you have passed this site and a figure here looks wrong, you can tell us. Not yet published
Responses to this record
Published as received, in the sender's words, without editing for length.
No response has been received. Everything on this page is drawn from what institutions published; if it is wrong, or incomplete, the reply is published here unedited beside it.
Respond to this record How the right of reply works